43.31 or 43.33: the difference between NACE codes

Related: both are in the same group

43.31 Plastering

F Construction › 43 Specialised construction activities › 43.3 Building completion and finishing

Includes

  • application in buildings or other construction projects of interior and exterior plaster or stucco, including related lathing materials
  • dry-walling of walls and plastering of ceilings

Previously (NACE Rev. 2)

43.31 Plastering (merged); 43.39 Other building completion and finishing (split)

EMTAK

43311 Krohvimine

EVRK

433100 Tinkavimas

Companies with this code

in Latvia 245 · in Estonia 183 · in Lithuania 132

43.33 Floor and wall covering

F Construction › 43 Specialised construction activities › 43.3 Building completion and finishing

Includes

  • laying, tiling, hanging or fitting in buildings or within other constructions of:
    • ceramic, concrete or cut stone wall or floor tiles, ceramic stove fitting
    • parquet and other wooden floor coverings, wooden wall coverings
    • carpets and linoleum floor coverings, including of rubber or plastic
    • terrazzo, marble, granite or slate floor or wall coverings
    • wallpaper

Also includes

  • sanding, polishing and sealing of parquet and other wooden floor coverings

Excludes

  • wall cladding for exterior walls, see 43.35

Previously (NACE Rev. 2)

43.33 Floor and wall covering (merged); 43.39 Other building completion and finishing (split)

EMTAK

43331 Põranda- ja seinakatete paigaldus

EVRK

433300 Grindų ir sienų dengimas

Companies with this code

in Latvia 953 · in Estonia 729 · in Lithuania 588

Sources: Eurostat, NACE Rev. 2.1 (© European Union, CC BY 4.0); Central Statistical Bureau of Latvia (Latvian titles, CC0); Valstybės duomenų agentūra (EVRK Rev. 2.1, CC BY 4.0); RIK e-äriregister (EMTAK 2025). Classification data: 2026-11-16. Download the dataset (CSV, JSON)